You don't have javascript enabled. Good luck with that.
Pencarian
Ini Progres Pembangunan Fase 2 MRT Jakarta

Here is MRT Jakarta Phase 2 Development Progress

The construction of phase 2A of the MRT Jakarta project is progressing on schedule. It can be seen from the Monas Station construction that has entered the stage of building the D-Wall for the station, including the construction of a new police post which has been relocated from Jalan Medan Merdeka Barat to Jalan Medan Merdeka Selatan (next to the entrance to Monas Park, Jalan Silang Medan Merdeka Barat Daya).

It will also be the meeting of the East-West line

Aside that, the jet grout and king post station projects have also started, including relocation of drainage and preparation of work equipment for D-Walls such as soil pits and foundation silos at Thamrin Station.

PT MRT Jakarta President Director William Sabandar disclosed his party was about to prepare a public information center in Monas Station area, which would function as a media center.

Progress of MRT Jakarta Phase 2A Construction Reaches 8.157 Percent

"It presents a number of mock-ups such as MRT Jakarta Phase 2, discovery of cultural heritage during construction phase 2, and a profile video of the MRT Jakarta," he expressed, Sunday (2/28).

He explained Thamrin Station is one of the stations in phase 2A, which will be the longest station, which is around 410 meters with a two-story underground building structure.

"It will also be the meeting of the East-West line. As for Monas Station is a station that is directly integrated with the Monas Park area. We target to finish them in March 2025," he explained.

He added it was different from phase 1, phase 2 was built at the same time by building a station area with a transit oriented development concept.

"Its construction doesn't only prepare the infrastructure for the Jakarta MRT station. However, it is also the area as a combination of transit and human functions, activities, buildings, and public spaces that will optimize access to public transportation thus it can support passenger carrying capacity," he explained.

As for the information, the phase 2A will connect the Bundaran HI Station to Kota Station for about 5.8 km and consists of six underground stations namely, Thamrin, Monas, Harmoni, Sawah Besar, Mangga Besar, Glodok, and Kota.

It is divided into two segments, namely Bundaran HI - Harmoni, which is targeted to be complete in March 2025 and Harmoni - Kota in August 2027.

Then the phase 2B, which is planned to continue from the Kota to West Ancol Depot, is still in the feasibility study stage.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1068 personFolmer
  2. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye451 personAldi Geri Lumban Tobing
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye450 personBudhi Firmansyah Surapati
  4. Setu Babakan Presents Arts and Culture Extravaganza to Mark Jakarta Anniversary

    access_time20-06-2026 remove_red_eye418 personNurito
  5. Pramono Ensures Transparency in Labor-Intensive Program Recruitment

    access_time19-06-2026 remove_red_eye389 personDessy Suciati